SY365H Launches 29-Year Mega-Project at South Africa’s Garatau Platinum Mine

A Symbolic Start: Global Partners Unite for a New Mining Era in Limpopo

On May 28th, the sun-drenched landscape of Limpopo, South Africa, bore witness to a historic convergence of industrial ambition and international partnership. At the site of the future Garatau Platinum Mine, a landmark groundbreaking ceremony was held, bringing together Nkwe Platinum Limited, its sole and powerful shareholder Zijin Mining Group, and global heavy machinery leader SANY. The event marked the official commencement of a monumental mining endeavor projected to span an estimated 29 years in its first phase alone. Central to this symbolic moment was SANY’s flagship excavator, the robust and reliable SY365H, which was entrusted with the honor of digging the ceremonial first bucket of earth.

This act not only signaled the physical start of construction but also embodied the deep trust and collaborative spirit between Chinese mining expertise, South African mineral wealth, and world-class engineering equipment. The crowd of dignitaries, engineers, and local community representatives watched as the SY365H smoothly executed its task, drawing immediate compliments and setting a positive, productive tone for the decades-long project ahead.

This partnership is significant on multiple levels. Zijin Mining Group, a titan in the global gold industry, brings immense financial resources and technical mining acumen to the project through its subsidiary, Nkwe Platinum. SANY, with its decades of experience serving mining houses worldwide, contributes the critical physical tools—the high-quality, durable machinery—required to turn geological potential into economic reality.

The Garatau Platinum Mine is more than an excavation site; it is a testament to cross-border investment in African infrastructure and a catalyst for sustained regional development. The choice of the SY365H for the ceremonial dig was a deliberate statement of confidence in the equipment that will form the backbone of the mine’s earthmoving and production activities for years to come.

SANY SY365H excavator performing the first dig at Garatau Platinum Mine groundbreaking

The SANY SY365H takes center stage, performing the ceremonial first dig at the Garatau Platinum Mine site in Limpopo.

Project Scope and Vision: A 29-Year Journey for Economic Transformation

The Garatau Platinum Mine represents a colossal investment in South Africa’s mineral future. The first phase of the project, with its 29-year life-of-mine estimate, is designed to achieve an average annual processing capacity of 3.6 million tonnes of ore. This scale of operation positions Garatau as a major player in the global platinum group metals (PGM) market, contributing significantly to the supply of these critical materials used in automotive catalysts, fuel cells, jewelry, and various industrial applications. The successful development of the mine hinges on a sustained, efficient, and reliable production schedule, making the selection of every piece of equipment a strategic decision of paramount importance.

Mr. Zhiyu Fan, Managing Director and CEO of Nkwe Platinum Limited, articulated the project’s broader vision during the ceremony. He emphasized that the mine’s value extends far beyond the extraction of precious metals. “We are pleased with the commencement of the Garatau Platinum Mine activities as it brings us one step closer to our commitment in infrastructure development as well as economic and social upliftment of the surrounding local communities, the municipal district and the Province of Limpopo,” stated Mr. Fan.

This commitment underscores a modern approach to mining, where corporate success is intrinsically linked to positive social impact. The project is expected to generate substantial employment, both during the construction phase and throughout its long operational life, offering not just jobs but also vital training and educational opportunities for the local workforce, thereby fostering skill development and long-term economic resilience in the region.

The mine’s development is set against the backdrop of South Africa’s complex but resource-rich mining sector. It signals continued foreign investor confidence and a partnership model that aims to balance profitability with profound social responsibility. For the communities of Limpopo, the rumble of the SY365H‘s engine symbolizes the sound of impending opportunity, infrastructure growth, and a tangible pathway toward improved livelihoods, making the machine an instrument of both industrial power and social progress.

The Machine of the Hour: Why the SANY SY365H Was Chosen for the Historic Task

The selection of the SANY SY365H excavator to perform the inaugural dig was a decision rooted in performance, symbolism, and proven capability. As SANY’s flagship model in its class, the SY365H is engineered to handle the most demanding mining and heavy construction tasks. Its design prioritizes immense digging force, exceptional stability, and fuel efficiency—attributes that are non-negotiable for a mine facing a nearly three-decade operational horizon. By choosing this specific machine, the project partners visually communicated their commitment to utilizing top-tier, reliable technology from the very outset.

The honor of operating the SY365H during the ceremony was given to Mr. Jingliang Liu, International Service Manager of SANY South Africa Business Unit. His involvement bridged the gap between manufacturer and end-user, highlighting SANY’s hands-on support and close partnership with its clients. Mr. Liu’s remarks reflected SANY’s overarching mission: “With over 30 years of experience with mining houses and companies all over the world, we look forward to delivering value to customers, employees, shareholders, and the public by offering high-quality products and services.”

This statement reinforces that SANY’s role is not merely that of a supplier but of a long-term partner invested in the project’s success. The SY365H is a product of this 30-year legacy, incorporating lessons learned from countless global mining applications to deliver a machine that maximizes uptime and minimizes total cost of ownership.

For the engineers and managers on site, the SY365H‘s smooth performance during the ceremony was a practical preview of the efficiency expected in daily operations. Its powerful hydraulic system delivered precise control for the symbolic dig, while its robust undercarriage and cab design hinted at the comfort and durability required for the long shifts ahead. The positive impression it made on the gathered crowd was a powerful, unofficial endorsement of the equipment fleet that will populate the mine.

Close-up of the SY365H cabin and robust engineering during operation

A detailed view of the SY365H, showcasing its powerful design and operator-focused cabin.

Engineering Excellence: Technical Capabilities of the SANY SY365H Excavator

The SANY SY365H is a hydraulic excavator built for maximum productivity in large-scale mining and quarrying operations. It typically falls within the 36-ton to 40-ton operating weight class, offering an optimal balance of power, mobility, and versatility. At the heart of the SY365H is a high-performance, fuel-efficient diesel engine that meets stringent global emission standards, ensuring powerful digging and slewing forces while keeping operational costs and environmental impact in check. The machine’s hydraulic system is designed for intelligent flow distribution, providing simultaneous and smooth operation of multiple functions without loss of power, which is critical for efficient loading cycles.

One of the key strengths of the SY365H is its structural durability. The reinforced X-shaped lower frame, strengthened boom and arm, and high-quality steel plates are designed to withstand the immense stresses of continuous hard rock digging. This built-in resilience translates directly into extended service life and reduced maintenance downtime, a crucial factor for the 24/7 operational demands of a platinum mine. The excavator also features an advanced, ergonomic operator cabin with superior visibility, low noise levels, and intuitive joystick controls, reducing operator fatigue and enhancing safety and precision during long shifts.

Furthermore, the SY365H is designed with serviceability in mind. Centralized grease points, easy-access service doors, and a modular component layout allow maintenance crews to perform routine checks and repairs quickly, maximizing the machine’s availability. For a remote mining operation like Garatau, where every hour of uptime is valuable, these design considerations are not just convenient—they are economically essential. The SY365H is more than a digger; it is a reliable, high-return asset engineered to be a cornerstone of the mine’s material handling fleet for years to come.

Technical Specifications and Performance Parameters of the SANY SY365H

Parameter Category Specification / Detail Significance & Impact at Garatau Mine
Model & Designation SANY SY365H Hydraulic Mining Excavator Flagship model chosen for its proven reliability and performance in mining applications.
Operating Weight Approximately 36-40 metric tons (varies with configuration) Provides optimal power-to-weight ratio for efficient loading of haul trucks in mine development.
Engine Power High-performance, low-emission diesel engine Delivers the necessary torque and horsepower for tough digging while meeting environmental guidelines.
Bucket Capacity Large capacity bucket (size varies, e.g., 1.6 – 2.2 m³) Maximizes material moved per cycle, directly contributing to meeting high annual ore processing targets.
Key Structural Feature Reinforced X-shape lower frame & strengthened boom/arm Ensures exceptional durability and longevity under constant, heavy-duty mining stress over a 29-year project.
Operator Environment Ergonomic cab with low noise, excellent visibility, climate control Promotes operator safety, comfort, and sustained high productivity during long shifts in a mining environment.
Serviceability Centralized lubrication, easy-access service points Minimizes planned and unplanned downtime, ensuring high machine availability critical for continuous operations.
Project Role Ceremonial first dig & ongoing earthmoving/loading operations Symbolizes project launch and will be a workhorse for site development, overburden removal, and ore loading.

Beyond Extraction: The Social and Economic Footprint of the Garatau Project

The narrative of the Garatau Platinum Mine, as highlighted by CEO Zhiyu Fan, is powerfully aligned with the principles of Social License to Operate (SLO). In today’s global mining industry, long-term success is inseparable from positive community integration and development. The project’s commitment to providing jobs, training, and education is a strategic investment in human capital that will pay dividends throughout the mine’s lifecycle and beyond. Skilled local operators will be needed to run machines like the SY365H, maintenance technicians will be required to keep the fleet running, and various administrative and support roles will be created.

This focus on local employment and skills development helps to ensure that the wealth generated from the region’s natural resources also builds enduring capacity within the community. It mitigates the risk of “enclave” development, where mines operate as isolated economic islands. Instead, Garatau aims to become an integrated engine for growth in the Limpopo province. The infrastructure developments associated with the mine—such as improved roads, power supply, and possibly water management systems—will also serve the broader community, leaving a legacy of improved connectivity and services long after the mining eventually concludes.

Therefore, the SY365H’s first dig was not just for ore; it was a dig for future opportunity. Each cycle of its bucket moving forward will be linked to training programs, local procurement initiatives, and community development projects. This holistic approach is essential for sustainable mining in the 21st century and sets a commendable precedent for other large-scale resource projects across the African continent.

SANY’s Strategic Footprint in Africa: Leveraging Decades of Mining Expertise

The involvement of SANY’s South Africa Business Unit in this ceremony highlights the company’s deep and growing commitment to the African market. As Mr. Jingliang Liu noted, SANY brings over three decades of direct experience working with mining companies worldwide. This experience is not just about selling machinery; it’s about understanding the unique challenges of mining in diverse environments—from the arid deserts to the tropical heat—and tailoring solutions accordingly. The African continent, with its vast mineral wealth and often challenging operating conditions, is a key strategic region for SANY’s global growth.

The Garatau project serves as a high-profile showcase for SANY’s product quality and service capabilities. By having a senior service manager operate the machine at the ceremony, SANY demonstrated its technical confidence and customer-centric approach. The company’s local presence in South Africa means that support, parts, and technical expertise are readily available, reducing operational risks for the mine owner. This local support network is critical for maintaining the high availability rates required for profitable mining, ensuring that machines like the SY365H receive timely maintenance and repairs.

Success at Garatau will resonate across the industry, potentially leading to further equipment sales and partnerships in Southern Africa’s competitive mining sector. SANY’s strategy of combining globally competitive machinery with strong local service and understanding of socio-economic contexts positions it as an ideal partner for developers like Nkwe and Zijin, who are investing in the future of African mining with a long-term, sustainable vision.

Conclusion: A Foundation Dug in Trust and Technology

The groundbreaking ceremony at the Garatau Platinum Mine was a multifaceted event rich in symbolism and substance. It marked the beginning of a 29-year journey that promises to transform a region’s economy and contribute meaningfully to the global supply of platinum group metals. At the heart of this moment was the SANY SY365H excavator—a machine whose robust performance served as both a practical tool and a powerful metaphor.

It represented the turning of soil not just for earth, but for opportunity; it signified the application of proven engineering to unlock future value; and it demonstrated the strength of international collaboration between Chinese investment, South African resources, and global manufacturing excellence.

As the project moves from ceremony to construction and into full-scale production, the SY365H and its successors in the equipment fleet will be tested in earnest. The expectations are high: to deliver the reliability and efficiency needed to process 3.6 million tonnes of ore annually, to operate sustainably in the challenging South African environment, and to become a catalyst for the social upliftment championed by the project’s leaders. Based on SANY’s legacy and the machine’s engineered capabilities, the SY365H is poised to meet these challenges. The first bucket dug on May 28th was more than a ritual; it was the first step in building a legacy of industrial achievement and community prosperity that will endure for nearly three decades.

Garatau Platinum Mine & SY365H: Project Highlights

May 28

Historic Groundbreaking Ceremony Date

29 Years

Estimated Life of Mine (First Phase)

3.6 Million Tonnes

Target Annual Ore Processing Capacity

SY365H

SANY’s Flagship Excavator for the First Dig

© 2025 SANY Heavy Industry Co., Ltd. All rights reserved. | Powering Sustainable Development Through Reliable Technology.

Related products

Below 40T Reach Stacker

Designed for efficient container handling with a maximum lifting capacity of 10-35 tons. Ideal for medium-duty operations in ports, warehouses, and logistics centers.

Models: SRSC1009-6E, SRSC3532H1-L

  • Max Lifting Height: 13910-16200mm
  • Wheelbase: 5000-6000mm
  • Equipped with advanced hydraulic system for smooth operation
  • Energy-saving design reduces operational costs

Over 40T Reach Stacker

Heavy-duty container handler with a maximum lifting capacity of 45-50 tons. Engineered for tough environments and large-scale logistics operations.

Models: SRSC4535G5, SRSC4535G5-S, SRSC4535H1, SRSC4535H4-65, SRSC4540G5, SRSC4540G5-75, SRSC4540G5-S, SRSC4540H4, SRSC4545H1

  • Max Lifting Height: 9300-15100mm
  • Wheelbase: 6000-8000mm
  • Reinforced structure for enhanced durability
  • Intelligent control system for precise handling

Request A Quote